MC
Moisture Correction Tool
L&T Construction · BALCO Smelter, Korba
Online
100%

Batch Record Details

Step 1 — Aggregate Moisture Test

IS 2386 (Part 3):1963
AggregateWet Sample (g)Dry Sample (g)Water (g)Moisture %Status

Moisture % = (Wet − Dry) ÷ Dry × 100  ·  IS 2386 (Part 3):1963

Step 2 — Select Mix Design(s)

Choose Grade + Cement Type and tap Add. Add multiple mixes for a combined report.

Quick:

Step 3 — Corrected Batching Quantities

Audit Trail & Sign-Off

GPS location not captured
Tested By — Lab Technician
Not signed
Checked By — QC Engineer
Not signed
QR & tamper-evident hash generate on Save / Export.
Reference: IS 2386 (Part 3):1963 · Mix design database per project JMF records · For internal QA/QC use, BALCO Aluminium Smelter Expansion, Korba.