Batch Record Details
Step 1 — Aggregate Moisture Test
IS 2386 (Part 3):1963 💾 Saved| Aggregate | Wet Sample (g) | Dry Sample (g) | Water (g) | Moisture % | Status |
|---|
Moisture % = (Wet − Dry) ÷ Dry × 100 · IS 2386 (Part 3):1963
Step 2 — Select Mix Design(s)
Choose Grade + Cement Type and tap Add. Add multiple mixes for a combined report.
Step 3 — Corrected Batching Quantities
Audit Trail & Sign-Off
GPS location not captured
Tested By — Lab Technician
Checked By — QC Engineer
QR & tamper-evident hash generate on Save / Export.
Reference: IS 2386 (Part 3):1963 · Mix design database per project JMF records · For internal QA/QC use, BALCO Aluminium Smelter Expansion, Korba.